How long does a bespoke kitchen take from first consultation to final installation in Ireland? Here’s a realistic timeline and what affects it.
Timeline is one of the most practical questions to get right before you start a bespoke kitchen project, and one of the most frequently underestimated. A bespoke kitchen in Ireland typically takes between 12 and 20 weeks from confirmed order to completed installation.
Stage 1: Initial Consultation (1–2 Weeks)
A detailed design consultation. Site visit and measured survey of the space.
Stage 2: Design Development (2–4 Weeks)
Detailed CAD drawings, material and finish specifications, worktop and appliance selection. In a genuine bespoke process this phase is iterative, you refine until it’s right.
Stage 3: Client Approval and Sign-Off (1 Week)
Full specification and fixed price agreed before manufacturing begins. Sign-off triggers the start of manufacturing.
Stage 4: Manufacturing (8–14 Weeks)
Stage 5: Delivery and Installation (1–2 Weeks)
Professional installation over one to two weeks depending on scope.
Stage 6: Snagging and Handover
A thorough snagging inspection before final sign-off.
Allow 20 weeks from first consultation to completed installation as a comfortable and realistic target. Starting the conversation earlier than you think you need to is always the right move.
Our luxury bespoke kitchens are designed and delivered to a fixed timeline agreed at the start of your project.
Begin your project today →kubeinteriors.com/our-kitchens/